Summer Development Plans

Posted by Colin Wynn on Jun 15, 2007 in Commercial Administer, Move Administer, Shipping Administer |

Administer Software LimitedFurther to our recent user survey (and many thanks to all that participated), we now have an idea of which enhancements are of high and low importance.

It is our aim that all 47 enhancements will appear in Move Administer, the majority during the summer period (now until end of August).

There were no surprises in that the facility to generate multiple PDF attachments on a single email was top of the list, which just goes to show that emailing stationery to customers is a huge advantage to our users. Runner up to multiple PDF attachments was a call back feature enabling reminders to be automatically and manually set (work has already begun on a prototype).

There were some surprises too, a margin report appearing to be of low importance to users, so too was the facility to share prospect addresses that were outside of their prospecting area.

An additional 15 enhancements were also provided during the survey, of which we see 10 being of benefit to others, and will probably be added to our summer development plans.

Work has now started on some of the enhancements, while the major ones will start in July, so please keep checking back for some interesting development news.

Share

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright © 2005-2024 The Development Blog All rights reserved.
Desk Mess Mirrored v1.6 theme from BuyNowShop.com.